NEW WELL PICTURES

 

Beginning start up of new well

 

begin drilling of large casing

 

crew with pipe

 

commencement of well drilling

 

air drilling waste from well hole going into containment

 

crew ready pipe for driller

 

inspector with Ron

 

bentonite machine that is used for pumping the bentonite in the hole thru the center of the pipe

 

Well stratas being recorded by WES

 

6 in. pPVC with laser cut screens

 

slury coming out with the sand  strata and being recylced

 

Bentonite bags to be used for sealing casing